In its efforts to "protect the environment and its natural resources
from the effects of various development operations and ensure
sustainable development," the Ministry of Housing, Municipalities,
and Environment issued Decision No. 1 of 1998 on "Environmental
Assessment of Projects."
The decision required new projects to submit an environmental impact
assessment report, especially projects located on reclaimed coasts
or new islands, and made the assessment a prerequisite for obtaining
a landfill permit.
Environmental impact assessment is an internationally recognized
tool for studying the potential effects of projects that may harm
the environment or the population. It is defined as a process that
aims to identify the negative and positive environmental effects of
development plans, whether tangible or intangible, direct or
indirect, immediate or future, at the local, regional, and global
levels, with the aim of reducing, treating, or avoiding
environmental damage as much as possible.
Bahrain first adopted an environmental impact assessment in 1998,
and the Supreme Council for the Environment was tasked with issuing
environmental permits for projects before other relevant authorities
issued the necessary licenses.
Dr. Hamoud Nasser, Associate Professor in the Department of Life
Sciences at the University of Bahrain, evaluated 20 environmental
assessment reports issued between 2004 and 2014 in a study entitled
"The Role of Environmental Impact Assessment in Protecting Coastal
and Marine Environments in Rapidly Developing Islands: The case of
Bahrain, Arabian Gulf." He found that 35 percent of the reports were
satisfactory according to quality indicators, while 65 percent were
unsatisfactory or barely met the requirements.
Dr. Hamoud attributed the poor quality of the reports to several
factors, including the outdated sources used for the assessment .
They also do not reflect recent developments in the environment, and
60 percent of them are not specific to the Arabian Gulf environment.
In addition, the reports do not take into account the cumulative
impact of projects located close to each other, and most of them do
not mention all the environmental components in the area to be
reclaimed, nor the spatial distribution of these components and
creatures. Eleven of the reports do not provide a comprehensive map
of the area.
With regard to the involvement of stakeholders in environmental
impact assessment reports, Hamoud points out that the reports
covered by the study mention consultation with official institutions
and even some members of parliament in four housing projects, but do
not include any reference to broad public participation.
In this regard, we asked Sarah (a pseudonym), an employee at one of
the companies tasked with studying the environmental impact of a
number of unnamed projects. She tells us that during the study the
researchers communicated directly with the government agencies
responsible for communicating with the local community.
Regarding the effectiveness of the environmental impact assessment
process in Bahrain, Sarah says "The current assessment process
follows internationally recognized standards and covers all aspects
of environmental impacts. It could be improved by making it more
detailed, as some Gulf countries follow stricter procedures in this
regard."
As for possible alternatives to the project site, Sarah explains
that the company only considers alternative sites if the client
(project owner) suggests them and requests an analysis. However, the
reports reviewed by Dr. Hamoud did not include any alternatives to
the projects. In addition, Dr. Hamoud pointed out that no
alternatives were proposed for 85 percent of the sand borrowing
sites.
To understand the mechanism for monitoring projects and issuing
violations, we spoke to Engineer Ahmed (a pseudonym), who has worked
on several projects. He confirms that "there is always monitoring
and continuous testing carried out by the relevant authorities."
He notes that the most prominent violations he observed during his
work included the leakage of water containing suspended solids in
excess of permissible limits, as well as offshore drilling outside
licensed sites. Penalties range from temporary suspension of the
project or complete shutdown in some cases, to requiring contractors
to modify their work plans to ensure compliance with environmental
standards and avoid repeating these violations.
In 2016, the government announced that it had issued 35 violations
and suspended six landfill projects due to their failure to ensure
the containment of turbidity caused by landfill operations within
the project boundaries.
Northern City
Dr. Hamoud's study is confirmed by another study conducted by Dr.
Walid Al-Saad, Dr. Sabah Al-Junaid, and Dr. Walid Zebari on the
environmental impact report prepared by a French consulting firm for
the Northern City project, a city consisting of ten islands located
on the northwestern coast of Bahrain. The project opened in 2018 and
has an area of approximately 7.4 kilometers.
The researchers concluded that the "investigation" in the French
firm’s report does not meet the basic requirements for environmental
impact assessment, as it does not provide data on marine
environmental monitoring in the northern region and the food chains
established there. The report does not address changes in the marine
environment during the seasons and does not include a projected
timeline for the recovery of the affected marine environment.
In the study, researchers found a negative impact of the project on
water quality, groundwater, marine environmental components, and
fish stocks, noting that the impact of the project on coastal marine
organisms in particular is extremely serious and cannot be
addressed.
The study points out that the mitigation measures proposed by the
French firmlack actual studies.
A number of studies confirm the effects of landfills on the marine
environment. A study by the Department of Life Sciences at the
College of Science at the University of Bahrain which included ten
marine landfill projects, found that 153 square kilometers of these
marine environments were damaged, including smooth rocks, algae,
seaweed, sand, coral reefs, and others.
Another study, published in the Journal of Environmental Science and
Engineering, confirmed that coral reefs have been extensively
damaged by several factors, the most important of which is coastal
erosion. Less than 6 percent of these coral reefs remain.
A report by the General Authority for the Protection of Marine
Resources, Environment, and Wildlife reveals a change in sea
currents and an increase in salinity on the west coast to more than
60 parts per thousand, compared to the normal salinity of the
Arabian Gulf, which ranges between 37 and 38 parts per thousand.
A study conducted by the Department of Life Sciences at the
University of Bahrain indicates that the losses resulting from
landfilling are estimated at $8,023 per year for every 10,000 square
meters buried, as a result of damage to environmental recycling and
food production, as well as the loss of environmental functions
performed by the coast, such as purifying pollutants, protecting
beaches from storms and erosion, and other vital roles.
Plans to landfill the coastline in Bahrain have not stopped, despite
the financial losses revealed by previous studies, the deterioration
of the marine environment, and the decline in fishermen’s
livelihoods,.